Skip to content

Guides

Deep dives on contractor pricing and estimating — worked examples, real numbers, and links to the calculator for each decision.

How to Calculate Labor Burden (And Why $25/hr Isn't $25/hr)

Payroll taxes, workers' comp, benefits — and the billable-hours divisor most explanations skip. Build your true hourly labor cost step by step.

7 min read

How to Write an Estimate: What Every Line Is For

An estimate isn't a form to fill in — it's the visible half of your costing math. What each section must contain, and the mistakes that lose jobs or lose money.

8 min read

General Contractor Markup: What's Typical and What Yours Should Be

Published GC markups range from under 10% to 50% — which tells you the number is a decision, not a fact. What the ranges actually reflect, and how to set yours.

7 min read

Flat Rate vs Hourly Pricing: Which Should You Use?

The trade-offs everyone lists, plus the part software blogs skip: the same job priced both ways, so you can see exactly where each model wins and loses.

7 min read

Minimum Service Charge: How to Set the Floor Price for Showing Up

A trip costs what it costs. Build your service-call floor from burdened labor, the truck, overhead and margin — instead of copying the shop across town.

6 min read

Markup vs. Margin: The Pricing Difference That Costs Contractors Money

The two words get used interchangeably on job sites, and the confusion is expensive. Here's the difference, the conversion, and the worked numbers.

6 min read

How to Price a Job: A Complete Method for Contractors

A repeatable five-step method for pricing any job: burdened labor, real material costs, overhead recovery, margin-correct pricing, and a sanity check before you hit send.

8 min read